日本免费在线观看视频-日本免费在线-日本免费一区二区在线观看-日本免费一区二区视频-2017国产小视频-2017能在线观看的网站

Scan code consultation:
0755-2102 2109
Technology
Technology
Current location: Home Technology Ex tech
How is explosion-proof testing conducted

SINO Testing Services

| 2020-12-23|Return

Explosion proof certification is the process of determining whether equipment meets the requirements of explosion-proof standards, conducting type tests and routine tests for adaptation, and issuing relevant certificates of conformity. The certificate can be for Ex devices or Ex components.

Domestic institutions



NEPSI - National Explosion proof Safety Supervision and Testing Station for Instruments and Meters

Inspection Guide


Explosion proof electrical product manufacturers should follow the following procedures when applying for explosion-proof certificates and test reports, and provide materials and prototypes.
Submission of inspection materials
1. Enterprise Qualification Certificate
Copy of the business license of the enterprise (at the time of initial inspection), introduction letter/power of attorney/application letter from the unit.
2. Enterprise Quality Assurance Certificate
According to GB3836.1-2010, enterprises should provide corresponding quality assurance certificates when submitting for review. When a company passes the ISO9000 series certification, providing a copy of the ISO9000 series certification is sufficient.
3. Technical data
The technical materials submitted by enterprises for review include enterprise standards or technical requirements, product drawings, user manuals, etc. All technical documents should be in duplicate.
a) Enterprise standards/technical requirements
The enterprise standards/technical requirements of the product should be written in the prescribed format, which should include not only the performance requirements of the product, but also relevant content related to explosion protection, such as basic parameters, explosion protection signs, environmental conditions for use, explosion protection performance requirements, relevant tests of explosion protection performance, and signs related to explosion protection.
b) Product drawings
When applying for an explosion-proof certificate for intrinsically safe electrical equipment, enterprises should provide assembly drawings, circuit schematics, printed circuit board diagrams, screen printing diagrams, component material lists, and nameplate diagrams. When enterprises move towardsZhongnuo TestingWhen applying for an explosion-proof certificate for non intrinsic safety electrical equipment, the technical data submitted for inspection should include drawings that can reflect the explosion-proof performance of the sample (including assembly drawings and part drawings). When the overall drawing can clearly indicate the explosion-proof parameters and structure of the product, only the overall drawing can be submitted for inspection.
The user manual should include basic parameters, explosion-proof markings, product outline drawings, installation, maintenance, ordering instructions, and clearly indicate to the user the precautions to ensure the explosion-proof performance of the product during installation and use.
d) Other information
For products with adhesives and sealants, the corresponding adhesive and sealant model names, performance specifications, and relevant process documents should be provided. For products with plastic shells, the material and corresponding performance documents of the plastic should be provided.
4. Sample submission for explosion-proof certificate application
The prototype submitted by the enterprise for inspection should be consistent with the approved drawings and fully assembled, and the number of inspection units should meet the requirements. If there are special disassembly tools, they should be sent together. For sealed electrical equipment, one set of products with intact sealing and one set of products without sealing should be sent. Observation windowZhongnuo TestingAn additional 5 transparent pieces should be sent, at least 3 pieces. An additional 8 pieces, at least 5 pieces, of transparent components for the lighting fixtures should be provided. The rubber aging test should provide 3-5 35 × 15 × 6 rubber blocks. Two plastic sheets with a diameter of 150 × 60 are required for measuring the insulation resistance of plastic shells. If the size allows, the plastic casing can be directly measured.
5. Application method:
5.1 Free application: The submitting unit shall apply on its own, prepare relevant materials, assist in debugging the prototype, and modify non-standard parts of the materials on its own, with a relatively long cycle and high comprehensive costs.
5.2 Proxy Application: Proxy application refers to the entire process of proxy application conducted by a professional explosion-proof electrical technology service organization. The intermediate data modification, prototype debugging, and progress coordination are entrusted to the proxy organization * to complete according to authorization, with good progress guarantee, and the signing of a proxy agreement in the middleZhongnuo TestingYou can get the certificate in about 30 days, but the downside is that you need to pay some agency fees.
Regarding the time for evidence collection:
The drawings and samples are complete and meet the standard requirements. There are no special or complex tests, and it usually takes one month.
Explanation of Evidence Collection Fees
Based on the explosion-proof mark of the product, the complexity and size of the product, the presence or absence of complex testing items, and consideration of representative models. Generally around 10000 yuan, representing an additional 10% for each model. For large-scale complete sets of products, series of products, and center charging standards that are not listed, they shall be executed in accordance with the Contract Review Procedure and determined through negotiation.  
change
If there are errors in the content of the explosion-proof certificate, it should be changed in a timely manner. For changes in the unit address and the original manufacturing unit name, the change procedures and application letter should be presented for the change.
Renewal of certificate upon expiration

When the expiration date of an enterprise's explosion-proof certificate is approaching, the enterprise should provide an application letter for certificate renewal within three months before and after the expiration date, and should bring the following information to apply for certificate renewal again. If there are any unexpected situations, please notify our center in a timely manner. The application letter includes the product name, model, original explosion-proof level, original explosion-proof certificate number, and an explanation of whether the product has been changed. The enterprise should also send the expired explosion-proof certificate and the technical data that have been sent for inspection to the center for re examination, and provide samples for re inspection.


Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號
Service Hotline
18924609560
點擊這里給我發消息 1354407946
點擊這里給我發消息 1354407946
神马久久精品| 成人免费观看49www在线观看| 韩国v欧美v日本v亚洲| 91久久久久久久久久久久久久| 国产成人精品一区二区三区在线 | 欧美国产精品人人做人人爱| 私拍精品福利视频在线一区| 一级黄色在线观看| 久久婷婷影院| 国产精品国产一区二区三区四区| 国产日韩欧美日韩大片| 欧美破处大片在线视频| 美美女免费毛片| 国产精品69页| 日韩片之四级片| 国产精品原创视频| www.久久久久久久| 91久久精品国产91性色| 99久久久无码国产精品| 狠狠干五月天| 97超碰在线资源| 91一区二区三区在线播放| av影片在线看| 日本一级淫片色费放| 91高潮在线观看| 99国内精品久久| 中文产幕区在线观看 | 在线亚洲免费视频| 窝窝社区一区二区| 91视频最新地址| 91九色在线观看视频| 一本大道久久a久久精品综合| 亚洲人成777| 亚洲精品视频91| 欧美久久在线观看| 亚洲精品一区二区三区蜜桃下载 | 精品国产91亚洲一区二区三区婷婷| 综合久草视频| 国产视频一二三四区| 在线码字幕一区| 一本色道**综合亚洲精品蜜桃冫| 国产精品伊人| 天堂一本之道| 久久久精品人妻一区二区三区| 午夜精品久久久久久99热软件| 日本欧洲一区二区| 亚洲成a人片在线| 欧美二区三区91| 亚洲国产欧美在线观看| 成片免费观看| 国产少妇在线观看| 中文字幕一精品亚洲无线一区| 国精品**一区二区三区在线蜜桃| 国产区在线观看| 亚洲成人在线电影| 久久精品国产精品青草色艺| 国产精品日韩成人| 亚欧洲精品视频在线观看| 黄页网站在线免费观看| 青草影院在线观看| 日本成人性视频| 久久人人爽人人爽爽久久| 中文字幕日韩av资源站| 成年永久一区二区三区免费视频 | 天堂网免费视频| 在线观看18视频网站| 欧美福利在线观看| 51久久夜色精品国产麻豆| eeuss影院www| 国产精品嫩草影院8vv8| 久久99国产综合精品女同| 久久国内精品自在自线400部| 二区三区不卡| 日日摸夜夜爽人人添| 亚洲色图综合区| 精品一区日韩成人| 欧美日本一区二区在线观看| 久久久天天操| 精品国产不卡一区二区| 夜鲁很鲁在线视频| 欧美做a欧美| 成人国内精品久久久久一区| 一区二区三区国产精品| 妖精视频成人观看www| 97人人爽人人澡人人精品| 欧美日韩一区二区区| 亚洲国产成人爱av在线播放| 天堂va蜜桃一区二区三区 | 在线亚洲精品| 国产69精品久久久久按摩| 国产精品久久亚洲不卡| 黄网站在线观看| aaa一区二区| 国产精品国产三级国产传播| 精品www久久久久奶水| 国产精品色午夜在线观看| 色综合久久88色综合天天| 26uuuu精品一区二区| 99re国产精品| 色综合色综合| 欧美最猛黑人猛交69| 加勒比在线一区| 中文字幕影片免费在线观看| 无码播放一区二区三区| 国产在线视频一区| 亚洲国产欧美一区二区丝袜黑人 | 91亚洲精品久久久蜜桃网站| 日韩一区二区久久| 日韩香蕉视频| а天堂中文最新一区二区三区| 精品孕妇一区二区三区| h免费在线观看| 无码国产色欲xxxx视频| 91成人国产综合久久精品| 国产主播在线观看| 国产一级生活片| 精品视频站长推荐| 亚洲精品在线视频播放| 国产成人av影视| 18禁免费无码无遮挡不卡网站| 91日韩在线播放| 欧美xxxx14xxxxx性爽| 欧美日韩在线播放三区四区| 91久久国产最好的精华液| 天天综合天天做天天综合| 亚洲五码中文字幕| 亚洲精品v日韩精品| 一区二区三区在线观看视频| 亚洲品质自拍视频网站| 国产精品国产自产拍高清av王其 | 久热精品视频在线| 日韩毛片在线观看| 国产一区二区三区视频| 中文字幕一区二区精品| 欧美疯狂性受xxxxx另类| 久久大大胆人体| 国产亚洲精品成人av久久ww | 亚洲精品一区二区三区99| 日韩一区二区三区高清免费看看| 欧美少妇一区二区| 日韩人体视频一二区| 色噜噜狠狠色综合中国| 精品国产福利在线| 一区二区三区精品| 色综合久久网| 欧美巨乳在线| 182在线播放| 亚洲第一二三四区| 懂色av一区二区| 999精品在线| av毛片在线播放| 国产黄色一区| 久9re热视频这里只有精品| 一区二区三区无毛| 福利片在线一区二区| 欧美视频福利| 国产成人精品在线看| 亚洲男帅同性gay1069| 91精品国产综合久久久久| 91精品国产色综合久久不卡蜜臀 | 无人码人妻一区二区三区免费| 少妇av片在线观看| av天堂一区二区三区| 男人打飞机网站| 国产宾馆自拍| 福利在线免费视频| 日韩精品一区二区久久| 一区二区福利| 成人国产精品免费观看| 中文文精品字幕一区二区| 亚洲欧美日韩中文播放| 狠狠干狠狠久久| 久久中文字幕国产| 欧美精品一区二区三区四区五区| 蜜桃视频一区二区在线观看| a级大片免费看| 久久久久人妻一区精品色欧美| 亚洲精品一区二区二区| 91网站进入| 成人欧美在线| 欧美疯狂party性派对| 久久99精品久久久久久国产越南| 久久久久久久久久久久久女国产乱| 色婷婷综合久久久久中文| 亚洲欧洲在线视频| 久久av二区| 女女互磨互喷水高潮les呻吟| aaaaa级少妇高潮大片免费看| 国产一区二区视频免费观看| 福利电影导航| 91免费精品国偷自产在线在线| 在线一区免费| 亚洲成人自拍偷拍| 日韩美女主播视频| 日本熟妇人妻xxxxx| 青青艹在线观看| 三级理论午夜在线观看| 精品久久久亚洲| 国产亚洲制服色| 久久久国产成人精品|